Engineering7 min readIn preparation
Producing evidence for BREEAM and WELL
How to plan environmental measurement so the method and evidence align with the applicable project requirements.
Start with the live requirement
Framework requirements and project interpretations can change. The applicable version, assessor expectations and evidence route should be confirmed before monitoring begins.
Do not retrofit the method
Parameters, locations, duration and documentation are stronger when planned around the evidence requirement rather than assembled after measurement.
Editorial status
This article is in preparation. The page currently provides a concise, non-regulatory overview and will be expanded following technical review.